From an audit request to a supportable response.

A completed work example: evidence map, open item, and management briefing for a privileged-access review request.

Fictional example. For demonstration only, not client work.

Download the PDF

The request and the evidence

This example shows how a limited set of records can be examined and an unresolved question made actionable.

The request asks the institution to demonstrate that privileged access to the system in scope was reviewed during the requested period. Available records are an access-review policy and a current privileged-account export. No completed review record has been supplied.

Evidence map

Field Completed example
Request Demonstrate the privileged-access review for the system and period in scope.
Available evidence Access-review policy and current privileged-account export.
What it supports A review expectation is documented. The export identifies accounts at extraction, subject to verification of its scope and completeness.
What it does not support That a review was performed during the requested period, who approved it, or how exceptions were resolved.
Evidence owner IT control owner.
Current status Further evidence needed. Control effectiveness has not been concluded.
Next action Locate the completed review record. Check the system, period, reviewer, approval, and disposition of exceptions.

An account list and a completed access review answer different questions. A missing record alone does not establish that the control failed.

The open item and the management decision

The same unresolved question now has an owner, a next action, and a defined basis for closure.

Open-item entry

Issue: The supplied records do not yet substantiate the requested access review.

Owner and next action: The IT control owner should locate the review record and exception follow-up. The preparation coordinator should agree a follow-up date against the actual review schedule.

Closure basis: Examine whether the additional records demonstrate the review for the correct system and period, including approval and exception handling. A statement that the task is complete is not sufficient evidence by itself.

Management briefing

What is known: A policy and current account list are available. Evidence of the historical review is still needed.

Why it matters: The current evidence cannot yet substantiate the response that the review occurred as requested. This is an evidence limitation, not a concluded control failure.

Decision needed: Assign responsibility for locating the record and agree follow-up timing. If the record cannot be found, document the limitation and determine whether corrective action is needed. A newly performed review does not prove that an earlier review occurred.

Apply the approach to the review ahead

An actual engagement uses the institution's agreed scope, records, and information-handling requirements. This example demonstrates reasoning, not a standard package or a guaranteed result.

Explore a focused readiness review or discuss the review and its timing. Do not send confidential records in an initial message.

Discuss an engagement

Before the request list arrives.

An examination on the calendar, a finding nobody can close, or a control area that has never been tested. Say which one it is and roughly when.

Discuss your review